• English
    • français
    • Swahili
  • Swahili 
    • English
    • français
    • Swahili
  • Ingia ndani
Advanced Search
Help Guide
Kioneshe 
  •   DSpace Mwanzo
  • Publications
  • Published Paper
  • Health and Wellbeing
  • 2023
  • Kioneshe
  •   DSpace Mwanzo
  • Publications
  • Published Paper
  • Health and Wellbeing
  • 2023
  • Kioneshe
JavaScript is disabled for your browser. Some features of this site may not work without it.

Assessing the Readiness to Provide Integrated Management of Cardiovascular Diseases and Type 2 Diabetes in Kenya: Results From a National Survey

Thumbnail
Tarehe
2023
Mwandishi
Otieno, P.
Agyemang, C.
Wami, W.
Wilunda, C.
Sanya, R. E.
Asiki, G.
Metadata
Show full item record
Usage Stats
0
views
0
downloads

Kwa ufupi
Integrated chronic disease management is the desired core function of a responsive healthcare system. However, many challenges surround its implementation in Sub-Saharan Africa. The current study assessed the readiness of healthcare facilities to provide integrated management of cardiovascular diseases (CVDs) and type 2 diabetes in Kenya.We used data from a nationally representative cross-sectional survey of 258 public and private health facilities conducted in Kenya between 2019 and 2020. Data were collected using a standardised facility assessment questionnaire and observation checklists modified from the World Health Organization Package of Essential Non-communicable Diseases. The primary outcome was the readiness to provide integrated care for CVDs and diabetes-defined as the mean availability of tracer items comprising trained staff and clinical guidelines, diagnostic equipment, essential medicines, diagnosis, treatment and follow-up. A cut-off threshold of ≥70% was used to classify facilities as 'ready'. Gardner-Altman plots and modified Poisson regression were used to examine the facility characteristics associated with care integration readiness. Of the surveyed facilities, only a quarter (24.1%) were ready to provide integrated care for CVDs and type 2 diabetes. Care integration readiness was lower in public versus private facilities [aPR = 0.6; 95% CI 0.4 to 0.9], and primary healthcare facilities were less likely to be ready compared to hospitals [aPR = 0.2; 95% CI 0.1 to 0.4]. Facilities located in Central Kenya [aPR = 0.3; 95% CI 0.1 to 0.9], and the Rift Valley region [aPR = 0.4; 95% CI 0.1 to 0.9], were less likely to be ready compared to the capital Nairobi.
Somo
Cardiovascular Diseases; Type 2 Diabetes; Integrated Care; Facility Readiness; Kenya
URI
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC10275139/
https://globalheartjournal.com/articles/10.5334/gh.1213
10.5334/gh.1213
http://knowhub.aphrc.org/handle/123456789/1065
Collections
  • 2023 [49]

KnowHub software copyright © 2002-2022  LYRASIS
Wasiliana nasi | Tuma maoni
Theme by 
Atmire NV
 

 

Peruzi

Dspesi yoteJumuhia na VifunguTarehe ya tukioMwandishi wa kitabuJina la kitabuSomoKifungu hikiTarehe ya tukioMwandishi wa kitabuJina la kitabuSomo

My Account

KuingiaSajili

KnowHub software copyright © 2002-2022  LYRASIS
Wasiliana nasi | Tuma maoni
Theme by 
Atmire NV